Commercial Scaffold Erection Bromley Colonades

The scaffold was erected to the rear elevation of Bromley Colonades. For this project, we erected an independent scaffold to the rear elevation of the Palace at a low level to give access for replacing the window panels. In total, the scaffold was 45 metres lineal X 5 metres high. The scaffold had 1 no: boarded platform and incorporated ladder access. The structure was tied to the wall using angled Raker tubes that were stabilised at ground level. We also installed a 3rd handrail at 2 metres to fix debris netting to the top boarded platform. Internally, we also erected a small mobile tower 2 metres square x 3 metres high to enable access to the underside of the glass. This project was erected in compliance with TG20.13.

SITE SURVEY CARRIED OUT BY. Mick Johnson 15 / 03 / 21

DUTIES OF ERECTOR.

All operatives were be deeded competent as defined by C.I.S.R.S / NVQ Qualification.

INSPECTION OF SCAFFOLD.

When completed, scaffolds are left in a condition suitable to perform the duty for which they are intended. The scaffold was inspected by a competent person representing SAS Ltd. When found appropriate, a Hand Over Certificate was issued. 

COVID-19 RISK CONSIDERATIONS.

At this current time, we were experiencing unprecedented circumstances. The Covid – 19 pandemics meant contractors must adhere to Government guidelines on social distancing while in the workplace.

Personal Protective Equipment.

  • Wearing gloves should be considered an absolute minimum.
  • Where RPE is prescribed, the user was face fit tested.
  • Re-useable PPE was thoroughly cleaned after use and not shared with other operatives.
  • Single-use PPE was disposed of at the end of each shift.

Project Details

DATE

March 2021

CLIENT

Foreshaw Building Services Ltd

Foreshaw Building Services Ltd

PROJECT TYPE
CONTRACTOR

Superior Access Scxaffolding Ltd