Commercial Scaffold Erection Orpington- Walnuts Leisure Centre

Scaffold erected inside Sports Hall at Walnuts Leisure Centre in Orpington.

For this project, we extended the existing Birdcage scaffold inside the sports hall to gain access to the roof to inspect for leaking. As we walked into the hall, the scaffold was erected adjacent to the wall’s full width on the left-hand side. In total, the scaffold was 18 metres long X 4 metres wide x 8 metres high to the underside of the glass panel roof. The scaffold was boarded out at a high level and incorporated ladder access. The structure was hilti tied to the wall.

This project was erected in compliance with TG20.13.

SITE SURVEY CARRIED OUT BY. Mick Johnson 05 / 03 / 21

DUTIES OF ERECTOR.

All operatives were deemed competent as defined by C.I.S.R.S / NVQ Qualification.

INSPECTION OF SCAFFOLD.

When completed, scaffolds were left in a condition suitable to perform the duty for which they are intended. The scaffold was inspected by a competent person representing SAS Ltd. When found suitable, a Hand Over Certificate was issued. 

COVID-19 RISK CONSIDERATIONS.

07 / 05 / 2020.

At this current time, we were experiencing unprecedented circumstances. The Covid – 19 pandemics meant contractors must adhere to Government guidelines on social distancing while in the workplace.

Personal Protective Equipment.

  • Wearing gloves was considered an absolute minimum.
  • Where RPE is prescribed, the user was face fit tested.
  • Re-useable PPE was thoroughly cleaned after use and not shared with other operatives.
  • Single-use PPE was disposed of at the end of each shift.

Project Details

DATE

March 2021

CLIENT

Foreshaw Building Services Ltd

Foreshaw Building Services Ltd

CUSTOMER / LOCATION
PROJECT TYPE
CONTRACTOR

Superior Access Scxaffolding Ltd